Building log book
Part L of the Building Regulations (conservation of fuel and power) requires that the building owner is issued with information about the building services to help them operate the building properly and efficiently. It is suggested that this is done by issuing a building log book to the building's facilities manager. Building log books are required for new buildings and for existing buildings where the services have changed. Whilst not a requirement of the Building Regulations, it is suggested that existing buildings would also benefit from a building log book.
The building log book is different to, but may draw upon, information in the building owner's manual, sometimes called the operation and maintenance manual (O&M manual), and the health and safety file. Unlike the building owner's manual it should be a concise document (20-50 pages for larger buildings and 5-10 pages for buildings under 200 sqm (the Carbon Trust's 'Building logbooks a users guide' page 8). It should be easy to understand, giving an overview of the way in which the building was originally intended to operate and any changes that have been made.
Building log books can be prepared following the guidance in the Chartered Institution of Building Services Engineers (CIBSE) TM 31 Log Book Toolkit.
Building log books may include:
- A description of key responsibilities.
- A schedule of contacts.
- A description of the overall building, including zoning and occupancy.
- A description of the building's operational strategy.
- A description of the building's services plant, controls and management systems.
- Changes that have been made to the building.
- Health and safety considerations.
- Maintenance requirements.
- Metering and monitoring strategy.
- The data used to calculate the TER (target CO2 emission rates) and BER (building CO2 emission rates), see emissions rates.
- The recommendations report produced along with the construction energy performance certificate.
- Building performance in use investigations and targets.
- References to other documents.
Preparation of the building log book should be co-ordinated by the lead designer. It should then be issued to the building's facilities manager at handover. If updates are required during the defects liability period, these will normally be made by the designers. The facilities manager should then take over responsibility for its ongoing development.
The building log book should be reviewed and updated annually by the facilities manager.
In addition to a building log book, it may also be prudent to prepare a non-technical 'building users guide' with information for users about environmental controls, access, security and safety systems etc.
[edit] Related articles on Designing Buildings
- Asset information model.
- BSRIA Soft Landings 2019 award winners.
- Building manual.
- Building Regulations.
- Building information modelling.
- Building owner's manual.
- Building user's guide.
- Emission rates.
- Energy targets.
- Handover to client.
- Health and safety file.
- Maintenance.
- Soft landings.
- Technical guide.
- U-values.
- Working with maintenance contractors.
[edit] External references
- The Carbon Trust's 'Building logbooks a users guide'.
Featured articles and news
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.






















Comments